SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

STS-104 Mission Control Center Status Report # 17 Friday, July 20, 2001 - 6 a.m. CDT

 
STATUS REPORT
Date Released: Friday, July 20, 2001
Source: Johnson Space Center


The two crews on board the International Space Station today completed checkout and activation of the new Quest airlock and conducted a dry run of the steps they will take before christening the newest station component.

STS-104 Commander Steve Lindsey, Pilot Charlie Hobaugh and Mission Specialists Mike Gernhardt, Janet Kavandi and Jim Reilly also got together with Expedition Two Commander Yury Usachev and Flight Engineers Susan Helms and Jim Voss inside Quest to answer questions from reporters in the U.S. and Russia.

Voss reported tracking down and sealing a minor leak discovered during an overnight pressure check. Air had found a path from the Equipment Lock segment of the new airlock to its Crew Lock, which is the segment the orbital construction workers will open to the vacuum of space when they step outside about 11:09 p.m. CDT Friday.

Flight Directors Paul Hill and Mark Kirasich talked with the crew about 1 a.m. Friday, going over the final details and sending up the good news that both the shuttle and station flight control teams agree all systems are "go" for the first station-based excursion out of the airlock. Lindsey sent down a video tour of the fully outfitted Quest module about 4:50 a.m.

The entire crew then reviewed the plan for Friday's five-hour space walk by Gernhardt and Reilly. On their third foray outside this mission, the pair will attach the final nitrogen gas tank to the airlock and climb to the top of the station's solar array truss to check on a swivel joint that allows the arrays to track the sun. If time allows, they'll also take a look a the nearby Floating Potential Probe that measures the plasma created as the arrays drag through the rarified atomic oxygen at 240 miles up.

Meanwhile, Usachev performed some periodic maintenance duties on the station's Russian systems, and helped Voss and Helms prepare for their work with the Candarm2 robotic arms operations related to Friday evening's space walk.

After some time off to rest up after a very busy week, the crews were scheduled to turn in at 8 a.m. Their alarm clock is scheduled to go off at 4:04 p.m.

The next mission status report will be issued about 6 p.m. Friday or as events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: November 22, 2009 - Spring Bloom in the South Atlantic Ocean

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free