NASA Mars Odyssey THEMIS Images: December 31, 2012 - January 4, 2013

Status Report From: Jet Propulsion Laboratory
Posted: Saturday, January 5, 2013

- Lava Channels (31 December 2012)

- Olympus Mons Escarpment (01 January 2013)

- Streamlined Islands (02 January 2013)

- Nili Patera Dunes (03 January 2013)

- South Polar Surface (04 January 2013)

All of the THEMIS images are archived here:

NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

// end //

More status reports and news releases or top stories.

Please follow SpaceRef on Twitter and Like us on Facebook.

SpringHill Suites Houston NASA/Webster