Operations Day - 361/2001 (27 December 01)
Mission Day 2218
SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC
Ref. #: SH-FOT-DR-011226
=====================================================================
PASS #1 Madrid DSS66 0637-1111
PASS #2 Goldstone DSS27 1558-1830
PASS #3 Canberra DSS46 1820-362/0650
*********************************************************************
PASS #1 Madrid DSS66 0637-1111
Anomalies:
None
NRT:
None
Activities Summary:
- SSR Dump
- Collected MDI-M (0817-0832)
- Collected MDI-H (0832-1050)
- Min/Max Data Collection (PROS)
- OBT Distribution to SWAN, CELIAS
- SSR SEF Reset
- SSR Record
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 24
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 24
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 25
------------------
PASS #2 Goldstone DSS27 1558-1830
Anomalies:
None
NRT:
None
Activities Summary:
- SSR Dump
- Collected MDI-M (1803-1819)
- Collected MDI-H (1819-1830)
- New Tracking Star Slot 1/ Magnitude 2.95
- Uplinked delayed load VIRA11228, SWA011227121
- Reaction Wheel Speed Monitoring Daily Adjustment
- CRS Drift Estimation Update
- HGA Table Upload
- Hx Limit Update
- SSR SEF Reset
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 24
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 25
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 25
------------------
PASS #3 Canberra DSS46 1820-362/0650
Anomalies:
G01-0518 2008 Lost uplink lock on spacecraft RCVR 2, cause unknown.
Lost command
ability for 4 minutes. DR #C100760.
NRT:
1918-2008
2021-2056
Activities Summary:
- Collected MDI-M (1829-2014, 0230-0332)
- Collected MDI-H (1820-1829, 2014-0230, 0332-0631)
- Min/Max Data Collection (PROS)
- OBT Distribution to SWAN, CELIAS
- Cleared COBS anomaly counter and table
- SSR SEF Reset
- SSR Record
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 24
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 24
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 24
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 25
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 25
- Executed CS-20B: Bat1 BCR Status Change - Std Mon 25
------------------
-- End of Report --
Please follow SpaceRef on Twitter and Like us on Facebook.