SOHO Daily Meeting Minutes for Thursday, 14 February 2002


ANNOUNCEMENTS
-------------
* For the remainder of the week, call Stein or Emily in case you
  need to get hold of a SOC.

* HESSI is ready to begin joint observations. HESSI target: NOAA 9825

* NRT plans for the immediate future:

  Today most teams will command on D66 in the morning, CDS and MDI will 
  command on D27 in the afternoon.

  Friday we have D66 and D16 during the day. The Intercal goes at 15:00,
  and LASCO loads a new plan afterwards, before the handover. During the 
  handover, MDI may ftp over a background load. CDS starts an FF_CAL study
  after the handover, together with MDI's background load uplinking (or 
  MDI NRT). CDS will also load science plans for the weekend. Station 27
  comes up starting around 22:00.

  Note that as soon as we get final plans for the remainder of the
  CELIAS/CTOF recovery, we will try to schedule that NRT pause at a 
  convenient time during daytime.

* Commanding schedule for next week:
  Monday -   D66 until 16:30, D27 after 19 UT.
  Tuesday -  D66 until 18:30 then D27.
  Wedesday - D66 until 18:30 then D27.
  Thursday - D/L only in the morning then D27 after 17:30 UT.
  Friday -   D/L only until 19 UT then D16.
  Saturday - Command on D27 all day.
  Sunday -   Command on D27 all day.


FOT REPORT
----------
Spacecraft Status: SVM Nominal, SUMER OFF
		   MDI, CTOF not yet in nominal operations

Spacecraft Anomalies:    None

Accomplished Activities: VIRGO, VC2 (1600-0200)

Planned Activities: VIRGO, NOM HGA Table, VC2 (1450-0800)

Upcoming Operations: None

Ground Anomalies: 
  044/1421 - TM Dropout; D66 rcvr problem (3 minutes, unrecoverable)
  044/1546 - NRT Interrupted; H/W Maintenance inadvertently pulled cable
  045/0837 - Intermittent lock on RCVR2 during D46 pass

 
SOLAR STATUS
------------
02/13 DOY 044 - 02/14 DOY 045

 EIT daily On-Line Solar Status and observations:
   http://umbra.nascom.nasa.gov/eit/plan/log_form20020214.html

 LASCO daily On-Line Solar Status and observations:
   http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.html


 Web Page for Planning:
   http://www.bbso.njit.edu/arm


INSTRUMENT STATUS
-----------------
CDS:	Nominal. Polarity reversal study in the south, active region 
	study near central meridian. Tomorrow: ICAL, studies TBD.

UVCS:	Nominal. Coronal hole observations and synoptic for today
	and tomorrow.

LASCO:	Nominal. C2/C3 synoptics.

EIT:	Nominal. 195 Angstrom CME watch and synoptics.

MDI:	Restarted structure and closed the loop yesterday, taking some 
        magnetograms and continuum images. Loads (w/pause in structure 
        program) and calibrations today. Only a few pixels in the flat
        field needs to be patched. Hope to be back in normal science 
        mode today.

TRACE:	Nominal. Continue observing AR#9825 and the other 
	regions of the complex; using both the 1600A 
	flarewatch/respond and white light flarewatch/respond 
	sequences. Goal is to co-observe flares with HESSI.