Status Report
From: Harvard-Smithsonian Center for Astrophysics
Posted: Friday, August 16, 2002
During the last week Chandra completed the observing schedule as planned.
Observations included a target of opportunity, the gamma ray burster GRB020813. This TOO required replanning the schedule in less than a day, interrupting the command load, and uplinking a substitute load using a real-time procedure.
The third eclipse of the current season, and the longest of the mission so far, occurred on August 12 with nominal power and thermal performance.
The observing schedule for next week is shown below. It includes the completion of last week
-------------------------------------------
RXJ1720.1+2638 ACIS-I Aug 19
MRK 663 ACIS-S
MRK 663 ACIS-S
AX J1511.7+5702 ACIS-S
RXJ1720.1+2638 ACIS-I
Radiation Belts Aug 20
G337.2 - 0.7 ACIS-S
GROTH-WESTPHAL FIELD ACIS-I Aug 21
RCS1325+2858 ACIS-S Aug 22
Radiation Belts
PSS2322+1944 ACIS-S Aug 23
M31-T5 ACIS-I
FTM0134-0931 ACIS-S
SNR N157B ACIS-S
HD1685 ACIS-I Aug 24
M28 ACIS-S
RCS1325+2858 ACIS-S
HS 1415+2701 ACIS-S
3C 6.1 ACIS-S
Radiation Belts Aug 25
3C 6.1 ACIS-S Aug 26
IC 342 X-1 ACIS-S
-------------------------------------------
All spacecraft subsystems continued to operate nominally.
// end //