Space Shuttle Program Requirements Control Board Minutes 6 July 2000

Status Report From: Johnson Space Center
Posted: Thursday, July 6, 2000

 ( ) Preliminary
                                                                ( )  Revision 1
                                        07/06/2000   12:52 PM   (X)       Final
                                                                               
                                                                               
                                                                               
                                    AGENDA                                     
                                   SSP PRCB                                    
                                 JULY 6, 2000                                  
                                                                               
                               BLDG 1, ROOM 602                                
                            10:00 A.M. - 5:00 P.M.                             
                                                                               
  ITEM   CR/PRCBD  OPR                 TITLE/ACTION DESCRIPTION
===============================================================================
                                                                               
    1    S061417R1          WALK-ON ACTION - GFE HARDWARE                      
          JSC-EA                                                               
                                                                               
         JSC-EA/1-1         DEVELOP A PLAN AND SCHEDULE TO REVIEW ALL EA GFE   
                            HARDWARE CERTIFICATION FOR ALL ENVIRONMENTS.       
                            REPORT TO THE PRCB.                                
                                                                               
         CLOSED W/ACTION                                                       
                                                                               
         PRESENTER(S):      JSC-EA/M. JANSEN                                   
                                                                               
-------------------------------------------------------------------------------
                                                                               
    2    S062139            STS-101 IN-FLIGHT ANOMALY                          
          MSFC-RSRM                                                            
                                                                               
         MSFC-RSRM/5-1      DETERMINE THE ROOT CAUSE AND CORRECTIVE ACTION     
                            FOR THE RH SAFE AND ARM DEVICE INCOMPLETE CYCLE    
                            AND MOTOR DAMAGE.  CLOSURE OF THIS ANOMALY IS A    
                            CONSTRAINT TO STS-106 LAUNCH.  REPORT RESULTS TO   
                            THE PRCB.                                          
                                                                               
         CLOSED W/MOD                                                          
                                                                               
         PRESENTER(S):      THIOKOL/T. BOARDMAN                                
                                                                               
-------------------------------------------------------------------------------
                                                                               
    4    S072107C           ADD LONESTAR / REMOVE TRIANA AND UPDATE            
          JSC-MT            STS-107 LAUNCH DATE                                
                                                                               
         APPROVED W/MODS                                                       
                                                                               
         PRESENTER(S):      JSC-MT3/P. WATSON                                  
                                                                               
-------------------------------------------------------------------------------
                                                                               
    FOR QUESTIONS ABOUT ITEMS ON THIS AGENDA, CONTACT J. REVIS 281-483-1299    
                                                                               
                                                                               
                                                                               
                                                                               
+=============================================================================+
| ITEMS DELETED SECTION      ITEMS DELETED SECTION      ITEMS DELETED SECTION |
+=============================================================================+
                                                          07/06/2000   12:52 PM
                                                                               
                                                                               
                                                                               
                                                                               
                              ITEMS DELETED FROM                               
                                SSP PRCB AGENDA                                
                                 JULY 6, 2000                                  
                                                                               
         CR/PRCBD  OPR                 TITLE/ACTION DESCRIPTION
===============================================================================
                                                                               
         S060341R4          PROGRAM WIRE INSPECTION STATUS                     
          JSC-MV                                                               
                                                                               
         USA/4-1            DESCRIBE THE FOLLOW-ON PLAN FOR PROTECTION AND     
         JSC-MV/4-2         VERIFICATION OF WIRE INTEGRITY IN THE AFT          
                            COMPARTMENT.  SPECIFICALLY ADDRESS MODIFICATIONS   
                            REQUIRED.  REPORT TO THE PRCB.                     
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         PRESENTER(S):      USH-OE/D. WHITE                                    
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S060341R5          PROGRAM WIRE INSPECTION STATUS                     
          JSC-MV                                                               
                                                                               
         JSC-MV/1-1         REVIEW INDUSTRY EXPERIENCE WITH ARC TRACKING,      
                            INCLUDING TESTING AND SUSCEPTIBILITY OF KAPTON     
                            WIRING TO ARC TRACK.  INITIATE TEST PROGRAM, AS    
                            REQUIRED, OR COMBINE TESTING WITH INDUSTRY AND     
                            OTHER GOVERNMENT TEST PROGRAMS TO DEFINE           
                            SUSCEPTIBILITY.                                    
                                                                               
         RESCHEDULED TO 6/29/00 SSP PRCB                                       
                                                                               
         USA/1-2            REVIEW INDUSTRY EXPERIENCE WITH ARC TRACKING,      
                            INCLUDING TESTING AND SUSCEPTIBILITY OF KAPTON     
                            WIRING TO ARC TRACK.  INITIATE TEST PROGRAM, AS    
                            REQUIRED, OR COMBINE TESTING WITH INDUSTRY AND     
                            OTHER GOVERNMENT TEST PROGRAMS TO DEFINE           
                            SUSCEPTIBILITY.                                    
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         JSC-MV/2-1         CONDUCT INDEPENDENT LABORATORY TESTING OF OV-102   
         USA/2-2            WIRE SAMPLES.  REPORT RESULTS OF ALL LABORATORY    
                            TESTING TO THE PRCB.                               
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         PRESENTER(S):      USH-OE/D. WHITE                                    
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S060341R6          PROGRAM WIRE INSPECTION STATUS                     
          JSC-MV                                                               
                                                                               
         JSC-MV/1-1         REPORT TO THE PRCB ON THE SPEC CLARIFICATION TO    
         USA/1-2            INCORPORATE ORIGINAL INSPECTION CRITERIA,          
                            REVISED INSPECTION REQUIREMENTS, TEMPORARY WIRE    
                            PROTECTION, AND TRAINING ACTIVITIES, ALL OF        
                            WHICH WERE STATUSED AT THE NOV. 17, 1999 PRCB.     
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         JSC-MV/2-1         REPORT TO THE PRCB ON THE RESULTS OF GSE           
                            MODIFICATIONS TO REDUCE MECHANICALLY INDUCED       
                            DAMAGE AT KSC AND PALMDALE.                        
                                                                               
         DEFERRED TO 06/29/00 SSP PRCB                                         
                                                                               
         USA/2-2            REPORT TO THE PRCB ON THE RESULTS OF GSE           
                            MODIFICATIONS TO REDUCE MECHANICALLY INDUCED       
                            DAMAGE AT KSC AND PALMDALE.                        
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         JSC-MV/3-1         REPORT TO THE PRCB THE STUDY RESULTS AND           
         USA/3-2            RECOMMENDATIONS FOR DESIGN CHANGES TO MINIMIZE     
                            SINGLE WIRE CRIT 1/1 FUNCTIONS.                    
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         JSC-MV/4-1         REPORT TO THE PRCB ON THE RESULTS OF EFFORT TO     
         USA/4-2            CONVERT TECHNICIAN JUDGEMENT OF SPEC               
                            REQUIREMENTS TO ENGINEERING REQUIREMENTS.          
                                                                               
         RESCHEDULED TO 06/29/00 SSP PRCB                                      
                                                                               
         PRESENTER(S):      USH-OE/D. WHITE                                    
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S060341R7          PROGRAM WIRE INSPECTION STATUS                     
          JSC-MV                                                               
                                                                               
         JSC-MV/1-1         REVIEW THE RCN TO DOCUMENT CRIT 1/1 WIRE           
                            HARNESS INSPECTION CRITERIA IN OMRSD AT THE        
                            PRCB.                                              
                                                                               
         PROCESSED OSB                                                         
                                                                               
         PRESENTER(S):      USH-OE/D. WHITE                                    
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S061035A           SPACE SHUTTLE EXTERNAL RF ENVIRONMENT              
          JSC-MS                                                               
                                                                               
         JSC-MS/2-1         SUBMIT CR(S) TO UPDATE SL-E-0001, SL-E-0002 AND    
                            APPLICABLE PAYLOAD AND MIDDECK DOCUMENTS TO        
                            REFLECT THE RESULTS OF THE INTERNAL RF             
                            ENVIRONMENT (BNA PHASE 3) STUDY, REPLACING THE     
                            1V/M SUSCEPTIBILITY REQUIREMENT.  AT THE SAME      
                            TIME SUBMIT CR TO UPDATE NSTS 07700, VOLUME X,     
                            BOOK 2, APPENDIX 10.10 TO CHANGE THE R.F.          
                            ENVIRONMENT DEFINITION.  REPORT TO THE PRCB.       
                                                                               
         DEFERRED TO 10/26/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      JSC-MS2/G. HOLT                                    
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S061481            REVIEW OF SIAT SHORT TERM RECOMMENDATIONS          
          JSC-MA            RESPONSES                                          
                                                                               
         JSC-MA/1-1         CONDUCT AN AUDIT OF THE NSTS 07700, VOLUME XI,     
                            SYSTEM INTEGRITY ASSURANCE PROGRAM PLAN (SIAPP)    
                            REQUIREMENTS, AND THE PROGRAM ELEMENT SIAPP        
                            IMPLEMENTATION PLANS.  DETERMINE THE ADEQUACY OF   
                            THE PROGRAM REQUIREMENTS REGARDING AGING AND       
                            SURVEILLANCE.  DEVELOP A RECOMMENDATION            
                            REGARDING THE STATUS OF SIAPP IMPLEMENTATION       
                            PLANS AND THEIR VALUE ADDED.  REPORT RESULTS TO    
                            THE PRCB.                                          
                                                                               
         DEFERRED TO 07/20/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      JSC-MA/W. HARRIS                                   
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S062139            STS-101 IN-FLIGHT ANOMALY                          
          MSFC-SRB                                                             
                                                                               
         MSFC-SRB/4-1       DETERMINE THE ROOT CAUSE AND CORRECTIVE ACTION     
                            FOR THE APU GEAR BOX CONTAMINATION WITH            
                            HYDRAZINE AND SEAWATER, AND IF THIS ANOMALY        
                            SHOULD BE DOCUMENTED AS A PROGRAM IFA.  CLOSURE    
                            OF THIS ANOMALY IS A CONSTRAINT TO STS-106         
                            LAUNCH.  REPORT RESULTS TO THE PRCB.               
                                                                               
         DEFERRED TO 07/13/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      MSFC-SRB/D. WOOD                                   
                            USK-GO/S. GORDON                                   
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S062141            STS-103 IN-FLIGHT ANOMALIES REVIEW                 
          JSC-MV                                                               
                                                                               
         JSC-MV/9-1         DETERMINE THE ROOT CAUSE AND CORRECTIVE ACTION     
                            FOR THE STS-103 CAMERA A PAN/TILT CABLE            
                            INTERFERENCE (MER-19).  REPORT RESULTS TO THE      
                            PRCB.                                              
                                                                               
         DEFERRED TO 08/03/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      JSC-EV/B. EMBREY                                   
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S071024GA          MATERIAL SUBSTITUTION REQUEST (MSR) PROCESS        
          JSC-MG            DOCUMENTATION CHANGE                               
                                                                               
         DEFERRED TO 07/13/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      USH-OE/L. WARD                                     
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S071219T           APPROVE SHUTTLE OBSERVATION CAMERA                 
          JSC-MS            IMPLEMENTATION ON STS-97, 98, 102, 100 & 104       
                                                                               
         DEFERRED TO 08/17/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      JSC-MS2/R. ADAMS                                   
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S071301            BASELINING SHUTTLE ENVIRONMENTAL ASSURANCE         
          MSFC-MP01         INITIATIVE PROGRAM PLAN                            
                                                                               
         DEFERRED TO 07/27/00 SSP PRCB                                         
                                                                               
         PRESENTER(S):      MSFC-MP71/A. MURPHY                                
                                                                               
-------------------------------------------------------------------------------
                                                                               
         S072108            ADD STS - 108 TO FDRD                              
          JSC-MT                                                               
                                                                               
         WITHDRAWN                                                             
                                                                               
         PRESENTER(S):      JSC-MT3/S. GAYLOR                                  
                                                                               
-------------------------------------------------------------------------------

// end //