ISS On-Orbit Status 28 Nov 2002

 
STATUS REPORT
Date Released: Thursday, November 28, 2002
Source: NASA HQ


All ISS systems continue to function nominally, except as noted previously or below. Flight Day 6 of Mission 11A.

After their wake-up at 8:50am (all times EST), the crews were greeted by warm Happy Thanksgiving messages, with thanks for their excellent work to date and for achieving what is hoped to be "a long-term victory over the CDRA". Later in the day, Shuttle CDR Jim Wetherbee delivered a grateful Thanksgiving message from Space Station Alpha to the ground.

Prepping for the second EVA began during crew breakfast. [After readying their EVA equipment, donning EMUs equipped with EVARM (EVA radiation monitoring) badges and SAFER (simplified aid for EVA rescue) units, and purging the suits, MS1 Mike Lopez-Alegria (EV1) and MS2 John Herrington (EV2) started the EVA pre-breathe protocol, using the Shuttle ergometer/bike to exercise while breathing pure O2 (from the Shuttle) for denitrogenation of their bodies. This was followed by a shorter 10.2-depress period in the Airlock (A/L). An additional PBA (portable breathing apparatus) was brought into the A/L which today was scheduled to contain five people during its isolated 10.2 psi ops.]

EVA-2 began at 1:36pm, 44 min. ahead of schedule, and is currently underway. Major tasks for the spacewalk are (1) installation and leak checks of two fluid jumpers (hoses) between the S0 and P1 trusses for eventually flowing ammonia [NH3] coolant between the trusses; (2) installation of four SPDs (spool positioning devices) on jumper connectors; (3) removal of the keel pin from the CETA (crew and equipment translation aid) cart and stowage; (4) installation of the second WETA (wireless video system external transceiver assembly) assembly on the P1, similar to the first WETA installed on the Node on 11/26; and (5) transfer of the CETA cart from the P1 truss to the S1 with the SSRMS/Canadarm2, operated by Whitson, Bowersox and Pettit, lifting it around the MT (mobile transporter) on the S0 segment. Two tasks were added to the EVA-2 "get-ahead" list based on items learned after EVA-1: mating a missing fiber optic cable connector (P652) for the WETA wireless helmet video camera system, and securing a dangling pip pin on the airlock thermal cover in its Velcro pouch. The EVA is the 48th spacewalk of station assembly, the 23rd from the ISS (the others from the Shuttle), and the 14th from the Joint A/L (the others from the Russian DC-1).

In order to assure that all EVA-2 objectives will be met, EV2 is using a Shuttle-supplied LiOH (lithium hydroxide) canister in his EMU instead of the METOX (metal oxide) can that was planned. The Metox from EV1's suit and one of the two Metox canisters used in the A/L during the 10.2 psi ops will be regenerated in the A/L bake-out oven after the conclusion of EVA-2.

The CDRA (carbon dioxide removal assembly) is operating nominally at full performance after last night's IFM (in-flight maintenance). [When CDRA failed yesterday at about 9:44am because of a sticking ASV (air selector valve, #104), ASV 104 R&R (removal & replacement) was moved up from 12/1 to last night. CDRA was accessed by Peggy Whitson using the previously proven procedure of sliding the TCCS (trace contaminant control subassembly) out of the rack to be able to wriggle in. After removing the ASV assembly, a dry white sticky powder was found in the valve and couplings. The crew cleaned the powder from the couplings and reassembled the filters. Following the valve R&R, a leak was discovered. The crew demated and remated one of the fittings, which fixed the leak. CDRA was successfully activated, is now operating nominally and has completed two half cycles as of 6:00am this morning.]

During the CDRA valve R&R/filter inspection activity, a LiOH canister was activated to control ppCO2 (partial pressure of CO2) levels on board. With the delay due to the leak following the R&R, the crew was instructed to install two additional LiOH cans to reduce the ppCO2 levels prior to crew sleep. The three LiOH canisters used for this activity came from the Shuttle LiOH allocation and do not affect the ISS LiOH stockpile.

The change-out of the RED (resistive exercise device) canister originally scheduled for tomorrow (11/29) was completed yesterday.

As of early this morning, two CWCs (contingency water containers) were filled from the Lab condensate water tank, collected from the CCAA air conditioning system. Two more CWCs were filled yesterday morning.

Crew handover activities are continuing at a brisk pace. [Today they cover US segment (USOS) payloads, USOS operational systems, IMS (inventory management system) file preparation activities, handover between the oncoming and offgoing commanders, and Soyuz systems and operations.]

Cargo transfers are continuing. [Science payloads brought up by STS-113 for the ISS are Foot/Ground Reaction Forces During Spaceflight, PCG-STES (protein crystal growth-single locker thermal enclosure system), ZCG (Zeolite crystal growth) furnace, and two new experiments for the MSG (microgravity science glovebox), viz., CSLM (coarsening in solid liquid mixture) and InSPACE, an experiment to obtain basic data on magnetorheological fluids (a new class of "smart materials"). Payloads returning to Earth are PCG-STES, ZCG, SUBSA (solidification using a baffle in sealed ampoules), and MEPS (microencapsulation electrostatic processing system).]

Expedition 6 CDR Ken Bowersox was scheduled to perform two status checkups of the Shuttle middeck payloads.

Daily routine maintenance of the SM environment control and life support system (SOSh) and preparation of the daily IMS update file for downlinking were assigned to Exp. 6 FE-1 Nikolai Budarin, while Exp. 5 FE-1/SO Peggy Whitson is scheduled for the regular daily Lab payload status checkup.

The Expedition 5 crew was reminded by TsUP of their filled-out Russian Census forms, which are to be returned on 11A and hand-carried by Sergei Treschev to Moscow.

Peggy Whitson and Ken Bowersox completed a functionality checkout of the CEVIS (cycle ergometer with vibration isolation) to verify the new uplinked procedure for using CEVIS in the manual mode. [This requires donning the Polar heart rate watch/transmitter for tracking heart activity during exercise, and adjusting the desired tension with a manual control knob during cycling at constant speed, while monitoring the load displayed on the control panel. Workload on the CEVIS is a function of tension and speed of pedaling.]

Crew sleep period begins tonight at 00:20am.

A Happy Thanksgiving holiday to all!


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- March Storm 2010 update

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NOMAD Outreach: Impacts of E-mail Services and Forwarding Policy - NITR 2800-2

NASA MODIS Image of the Day: November 20, 2009 - Snow Across Ontario, Canada

NASA Expendable Launch Vehicle Status Report 19 Nov 2009

Joint USAF/NOAA Report of Solar and Geophysical Activity 19 Nov 2009

NOAA SATOPS Morning Report: Wednesday, November 18, 2009

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free