MRPO Daily Status Report 12-19-02


GMT Date: 353

Calendar Date: 12/19/02

Increment: 6

Stage: 11A

Week 3

Payloads currently on-board ISS:
BSTC, CGBA, CSLM-2, InSPACE, MAMS, MSG (facility), PFMI, SAMS, STES-10, SUBSA and ZCG.

Status:
MRPO payloads MAMS, SAMS, STES-10 and ZCG continue nominal, basically unattended, operations. BSTC, CGBA, CSLM-2, InSpace, PFMI, and SUBSA are inactive. MSG is inactive/failed, awaiting replacement parts.

EXPRESS RACKS 1, 2 and 4 (ER1, ER2 & ER4) are powered and supporting payload operations. ER3 power was turned on today to support ground checkout of the rack in preparation for future payload operations. Checkout was successful except for the SAMS team attempts to communicate with their ER3 electronics equipment. ER3 power will be turned off later today. ER5 is available to support payload operations but is currently inactive.

MAMS is operating nominally in the quasi-steady mode. HiRAP is currently inactive. MAMS data is available on the acceleration measurement web page.

All SAMS sensors in EXPRESS Racks are operating nominally. The SAMS sensor in the MSG is currently turned-off. SAMS attempts to communicate with their electronics equipment in ER3 during todays checkout were not successful. The team is developing trouble-shooting procedures. SAMS data is also being posted to the acceleration measurement web page.

STES-10 health and status data is nominal. STES-10 is configured with diffusion-controlled chambers which require no crew operation activities.

ZCG furnace operations were initiated Tuesday and the payload is down-linking nominal health and status information. The furnace is scheduled to operate until New-Years Day.

Near-term Outlook:

Week 3 (12/16-12/22) –Planning for this week was based on approximately 11 hours of crew time availability for NASA payload operations. ZCG furnace operations are continuing. The new High-Rate Communications Outage Recorder (HCOR), delivered by STS-113, is scheduled for installation during this week. The HCOR will replace the Medium rate recorder (MCOR) that has been in use since Increment 2.

Week 4 (12/23-12/29) – Preliminary planning for this week is being based on approximately 10 hours of crew time availability for NASA payload operations. ZCG furnace operations will continue during this week. There are no crew activities scheduled for MRPO payloads during this week.

M. Vlasse, PhD, DSc
MRPO Increment Scientist

ACRONYMS:

ARIS--Active Rack Isolation System
BCSS -- Biotechnology Cell Science Stowage
BSTC-- Biotechnology Specimen Temperature Controller (General status information on this payload will include coverage of the following items of support equipment: BTR, BCSS and GSM)
BTR -- Biotechnology Refrigerator
CGBA – Commercial Generic Bioprocessing Apparatus
ER1-- EXPRESS RACK 1
ER2 -- EXPRESS RACK 2
ER3 – EXPRESS RACK 3
ER4 – EXPRESS RACK 4
ER5 – EXPRESS RACK 5
GSM -- Gas Supply Module
HCOR -- High-Rate Communications Outage Recorder
InSPACE– Investigating the Structure of Paramagnetic Aggregates
ISS – International Space Station
MAMS -- Microgravity Acceleration Measurement System
MCOR -- Medium-Rate Communications Outage Recorder
MSG – Microgravity Science Glovebox
PFMI – Pore Formation and Mobility Investigation
PGBA – Plant Generic Bioprocessing Apparatus
SAMS -- Space Acceleration Measurement System II
STES – Protein Crystal Growth - Single Thermal Enclosure System
SUBSA – Solidification Using a Baffle in Sealed Ampoules
jpg – Zeolite Crystal Growth