MRPO Daily Status Report 3-7-03



GMT Date: 066

Calendar Date: 03/07/03

Increment: 6

Stage: 11A

Week 14

Payloads currently on-board ISS:
BSTC, CGBA, CSLM-2, InSPACE, MAMS, MSG (facility), PFMI, SAMS, STES-10, SUBSA and ZCG.

Status:
MAMS, SAMS and STES-10 continue nominal, basically unattended, operations. BSTC, CGBA, CSLM-2, InSpace, PFMI, SUBSA and ZCG are inactive. MSG is in a trouble-shooting mode.

EXPRESS RACKS 1 and 4 (ER1 & ER4) are powered and supporting payload operations. ER2, ER3 & ER5 are currently powered down.

The MSG circuit breaker problem is continuing to be evaluated and troubleshooting procedures are being carefully implemented. Thirteen sensor cables were disconnected from MSG last Friday, leaving five sensors connected that were verified to cause no problem with MSG powered. The disconnected cables are now being reconnected one at a time to try to isolate the connection that is causing an MSG circuit breaker to trip. Today, the third sensor cable was reconnected (total of 8 sensors connected currently) and MSG power was turned-on for several hours. No problem occurred so the fourth cable was connected in preparation for being powered tomorrow.
InSpace Coil assemblies may need to be inspected again prior to beginning test operations if it becomes feasible to install the payload in the MSG.

MAMS is operating nominally in the quasi-steady mode. HiRAP is currently inactive. MAMS data is available on the acceleration measurement web page.

PFMI hardware removal from the MSG is contingent upon success of MSG trouble-shooting.

All SAMS sensors in EXPRESS RACKS are operating nominally. The SAMS sensor in the MSG is currently turned-off. The plan to mount a SAMS sensor on a cycle ergometer during week 16 has been cancelled. SAMS data is also available on the acceleration measurement web page.

STES-10 health and status data is nominal. STES-10 is configured with diffusion-controlled chambers that require no crew operation activities.

Near-term Outlook:

Week 14 (3/3-3/9) – Planning for this week was based on approximately 7 hours of crew time for NASA payload operations. MSG trouble-shooting will continue on 3/8.

Week 15 (3/10-3/16) - The recently added EVA originally planned for week 16 has been delayed until week 17 so week 15 planning is now being based on approximately 10 hours of crew time for NASA payload operations. Time is allocated to continue MSG trouble-shooting.

M. Vlasse, PhD, DSc
PSR Increment Scientist


ACRONYMS:

BCSS Biotechnology Cell Science Stowage
BSTC Biotechnology Specimen Temperature Controller (General status information on this payload will include coverage of the following items of support equipment: BTR, BCSS and GSM)
BTR Biotechnology Refrigerator
CGBA Commercial Generic Bioprocessing Apparatus
ER1 EXPRESS RACK 1
ER2 EXPRESS RACK 2
ER3 EXPRESS RACK 3
ER4 EXPRESS RACK 4
ER5 EXPRESS RACK 5
GSM Gas Supply Module
InSPACE Investigating the Structure of Paramagnetic Aggregates
MAMS Microgravity Acceleration Measurement System
MSG Microgravity Science Glovebox
PAO Public Affairs Office
PFMI Pore Formation and Mobility Investigation
PGB Plant Generic Bioprocessing Apparatus
PSR NASA Code U Physical Sciences Research Division
RIC Rack Interface Controller
SAMS Space Acceleration Measurement System II
SPD NASA Code U Space Products Development Division
STES Protein Crystal Growth - Single Thermal Enclosure System
SUBSA Solidification Using a Baffle in Sealed Ampoules
ZCG Zeolite Crystal Growth