SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Tuesday, February 9, 2010    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

ESA Venus Express Status Report No. 50 - Start of Conjunction Operations

 
STATUS REPORT
Date Released: Monday, October 30, 2006
Source: ESA Venus Express Mission


24 Oct 2006 09:03

Report for Period 15 October to 21 October 2006

During the reporting period the mission operations have been conducted according to the plan. The spacecraft has been configured for conjuntion operations during the solar conjunction period, which is planned to end on 9 November 2006. During this period the payload is switched off.

Some uplink problems from Cebreros related to the X-Band up converter were encountered throughout the reporting period. Spacecraft operations were performed according to plan.

The table below shows a chronology of the main activities in the reporting period:

MET (Day) Date DOY VPER# Main Activity
341 15/10/06 288 177 Routine science operations
Payloads OFF
TCM (out of pass)
342 16/10/06 289 178 Configuration for Conjunction operations
Service 12 TT&C switch over
343 17/10/06 290 179 Reconfiguration to nominal Tx chain
TM bit rate change to 298 bps
TC bit rate change to 250 bps
344 18/10/06 291 180 Conjunction operations
345 19/10/06 292 181 Conjunction operations
346 20/10/06 293 182 Conjunction operations
Maximized tracking time for orbit determination
347 21/10/06 294 183 Conjunction operations

At the end of the last Cebreros pass in the reporting period (DOY 294, 16:00z) Venus Express was orbiting Venus at 256 million km from the Earth. The one-way signal travel time was 855 seconds.


Payload Activities

ASPERA
The instrument is OFF throughout the conjunction period.

MAG
The instrument is OFF throughout the conjunction period.

PFS
The instrument is OFF and remains inactive.

SPICAV
The instrument is OFF throughout the conjunction period.

VeRA
The USO is nominally powered but muted. Solar Corona Observations using DSN 70m station in Canberra were performed on DoY 290, 291, 292, 293, 294.

VIRTIS
The instrument is OFF throughout the conjunction period and the release of VIRTIS related commands from the MTL is disabled until actions to prevent further safe modes have been taken.

VMC
The instrument is OFF throughout the conjunction period.


Mission Planning

Short Term Planning
Operations planning for the conjunction period STP24, 25, 26, 27 have been completed successfully in the previous reporting period. DSN key file for Solar Corona observations in STP25 has been produced and sent to DSN.

Medium Term Planning
MTP09 was fully processed and a report generated.

Long Term Planning
Cebreros Maintenance windows for 2007 were negotiated and scheduled in station allocation file.

VSOC should provide to VMOC Radio Science New Norcia requirements for October to December 2007.


Future Milestones

The centre of conjunction will occur at a minimum Sun-Earth-Probe angle of 0.953° on 28 October 2006 (DoY301).

Conjunction exit is planned for 9 November 2006 (DoY313).

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Pratt & Whitney Rocketdyne's Space Shuttle Main Engines Power Delivery of Robotic Control Station and Module

- NASA Ames Hosts Wind Tunnel Tests to Improve Semi-Trucks' Fuel Efficiency

- Spotlighting ESA's year of technology innovations

- NASA Solicitation: Mars Mission Organics Detection Instrument

- NASA Award: Recovery Act: Active Electromechanical Suspension System for Planetary Rovers

- NASA Solicitation: Science Evaluation Asessments Studies Services and Support

- NASA Solicitation: Poly-Picosatellite Orbital Deployer NPP Mission Support

- NASA Award: Recovery Act: Radiation Resistant Reconfigurable Shape Memory Rubber Space Arrays

- NASA Award: Recovery Act: Odor Control in Spacecraft Waste Management

- NASA Award: Recovery Act: Automated Hybrid Microwave Heating for Lunar Surface Solidification

- NASA Recovery Act: Self-deploying Composite Habitats

- NASA Synopsis: Industry Conference Sponsorship

- Zero Gravity Corporation Brings Sky High Adventure To Sin City With Exclusive Weightless Flight, February 27

- Boeing Prepares Last Major Piece of Hardware for International Space Station

- NASA Expendable Launch Vehicle Status Report 5 Feb 2010

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: February 9, 2010 - Patagonian Dust over the Atlantic Ocean

NASA Aerospace Safety Advisory Panel Meeting 24 Feb 2010

NASA STS-130 Report #03 6 a.m. CST Tuesday, Feb. 9, 2010

Negative Ions a Positive Sign for Liquid Water in Enceladus

NASA STS-130 Report #02 6:30 p.m. CST Monday, Feb. 8, 2010

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Wedding Dresses Etc. - wedding planning tips and bridal fashions. Paradise Style Group Ð wedding and special occasion dresses.