SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Tuesday, February 9, 2010    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

 
STATUS REPORT
Date Released: Sunday, November 22, 2009
Source: Johnson Space Center - Comments Comments


image

Mission Control Center, Houston, Texas

HOUSTON - It's two down and one to go for Atlantis' spacewalkers.

Mike Foreman and Randy Bresnik wound up a successful 6-hour, 8-minute outing after completing their scheduled tasks ahead of schedule and get-ahead jobs. The official end of the spacewalk was at 2:39 p.m. CST. It was the second of the three scheduled during Atlantis' visit to the International Space Station.

The start was a little later than planned, about 8:30 a.m., because a false depressurization alarm had sounded on the station at 8:53 p.m. Friday, interrupting the crews' sleep and the spacewalkers' campout in the Quest airlock. The spacewalkers completed the process of reducing the nitrogen in their blood by doing exercise while breathing oxygen.

The first job was installing an antenna assembly called GATOR on a Columbus module handrail. The assembly includes an antenna for a ship identification system and another for ham radio. With support from intravehicular officer Robert Satcher Jr., they completed that task about 40 minutes ahead of schedule.

Then they relocated the station's floating potential measurement unit to the Port 1 Truss. The device, which measures electrical potential of the station, was moved to make way for an alpha magnetic spectrometer to be delivered next year.

Next, after a trip back to the airlock to recharge the spacesuits' oxygen, was deployment of a payload attachment system on the upper part of the Starboard 3 (S3) Truss. The first PAS was deployed ahead of schedule during the Thursday spacewalk, so installation of the second, which had been scheduled for Monday's spacewalk, was moved up to today.

The PAS is a stowage system for spare parts. To set it up, the spacewalkers had to remove two braces, swing out the PAS from the truss on which it was launched, and then reattach the braces to support it in its new position.

The final scheduled task of the spacewalk was installation of a wireless video system on S3. The system transmits video from the cameras on spacewalkers' helmets. They finished that chore more than an hour ahead of schedule.

Flight controllers added get-head tasks. The major one was deployment of a third PAS, this one on the Earth-facing side of S3. Most recently that job had been added to the third spacewalk, but the crew was so far ahead, they were told to do it Saturday. The task was accomplished smoothly and quickly.

The crew also disconnected, examined, photographed and reconnected the troublesome antenna cable Discovery astronauts on STS-128 had been unable to hook up. Thursday spacewalkers had succeeded in mating the cable, but instrument readings were not as expected.

Finally, the spacewalkers moved a tool stanchion on Pressurized Mating Adaptor 1, which links the U.S. and Russian segments of the station, and relocated an articulated portable foot restraint.

Just before the beginning of the Saturday spacewalk, Express Logistics Carrier 2 was installed on S3 by the station's robotic arm, operated by Leland Melvin and Nicole Stott. It holds almost 10,000 pounds of large spares for the station, including an attitude-control gyroscope, a high-pressure oxygen tank and a pump module.

A sister cargo carrier, ELC 1, also came to the station on Atlantis and was installed at about the time the first spacewalk began on Thursday.

The next shuttle status report will be issued Sunday after crew wake-up.

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Pratt & Whitney Rocketdyne's Space Shuttle Main Engines Power Delivery of Robotic Control Station and Module

- NASA Ames Hosts Wind Tunnel Tests to Improve Semi-Trucks' Fuel Efficiency

- Spotlighting ESA's year of technology innovations

- NASA Solicitation: Mars Mission Organics Detection Instrument

- NASA Award: Recovery Act: Active Electromechanical Suspension System for Planetary Rovers

- NASA Solicitation: Science Evaluation Asessments Studies Services and Support

- NASA Solicitation: Poly-Picosatellite Orbital Deployer NPP Mission Support

- NASA Award: Recovery Act: Radiation Resistant Reconfigurable Shape Memory Rubber Space Arrays

- NASA Award: Recovery Act: Odor Control in Spacecraft Waste Management

- NASA Award: Recovery Act: Automated Hybrid Microwave Heating for Lunar Surface Solidification

- NASA Recovery Act: Self-deploying Composite Habitats

- NASA Synopsis: Industry Conference Sponsorship

- Zero Gravity Corporation Brings Sky High Adventure To Sin City With Exclusive Weightless Flight, February 27

- Boeing Prepares Last Major Piece of Hardware for International Space Station

- NASA Expendable Launch Vehicle Status Report 5 Feb 2010

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: February 9, 2010 - Patagonian Dust over the Atlantic Ocean

NASA Aerospace Safety Advisory Panel Meeting 24 Feb 2010

NASA STS-130 Report #03 6 a.m. CST Tuesday, Feb. 9, 2010

Negative Ions a Positive Sign for Liquid Water in Enceladus

NASA STS-130 Report #02 6:30 p.m. CST Monday, Feb. 8, 2010

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.