SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Friday, October 31, 2014    
 

Advertisement
SpaceRef - Your Space Reference
ISS Home | Calendar - News - Photo Gallery - Space Directory - Space Station Guide - Space Weather

News | Astrobiology Web - Mars Today - Space Elevator - Space Wire - SpaceRef Store
Space Station User's Guide
STS-107 Information
Space Station Location
ISS Location NOW/NASA MSFC
Real Time ISS Tracker - More Links

User's Guide Sections
  • Acronyms
  • Assembly/Resupply Missions [Old]
  • Contingencies and Emergencies
  • EVA Operations
  • Shaded Images: ISS-3A to ISS-3S
  • Element Drawings
  • Logistics Vehicle Capabilities
  • Medical Operations
  • Operations
  • ISS Computer Systems
  • Tracking
  • ISS Overview
  • Science and Utilization
  • Schedules and Plans
  • Imagery
  • Weather
  • .
    News ISS Missions Station Sightings
    News Archive
    SpaceRef News
    ISS Missions 1998-2006[Old]

    Contingency and Emergency Operations

  • International Space Station Emergency Operations, Mission Operations Directorate, 20 October 2000 [English - Acrobat]

    According to this document's introduction: "In case of emergency situation the crew is responsible to record GMT and report to MCC at earliest available comm pass The crew bears all responsibility for any actions performed in departure from the crew procedures ISS CDR is responsible for crew and station safety, ISS CDR directs and coordinates all crew activities Crew member in charge of a station segment is responsible for performance of all the segment-related actions." This 65 page document contains a varety of emergency procedures to be followed in case of leaks, fires, and other emergency situations.

  • Integrated Russian Segment Emergency Operations, Mission Operations Directorate, 1 August 2000 [English - Acrobat]

    According to the dcoument's introduction this 45 page document contains " crew procedures determine initial order of crew actions in case of depress and fire at the 2R flight flight phase These crew procedures may be updated ISS assembly, pending systems modification and procedure validation at simulators and training facilities."

  • International Space Station Complex Operations Emergency Procedures All Expedition Flights, JSC-48512-E1, Mission Operations Directorate, Operations Division, August 16, 2000 [English - Acrobat]

    This 155 page document covers a variety of procedures for the crew to use in dealing with emergency situations aboard the ISS.

  • ISS Program Off-Nominal Situation Plan, SSP 50562, 27 October 2000, [Word 1.0 MB]

    "The International Space Station (ISS) Program organizations review potential Off-nominal Situations (ONS) to ensure that timely decisions and plans are made to preserve the ISS mission plan and mitigate any potential safety risk or impact on research. The prevention of and recovery from ONS is taken into consideration in all phases of the development and operation of the ISS. Potential ONS are identified and assessed by all ISS program organizations. Redundancy built into the ISS hardware and systems, operations planning for reserve crew supplies in case of missed resupply, propellant reserve supplies, critical spares, and malfunction procedures are examples of program processes designed to overcome or mitigate the risks of ONS. This document describes the overall ISS Program ONS processes, development schedule timeline, and documentation product flow for defining, planning, and documenting ONS and agreed to response measures in order to ensure that the appropriate flight products are developed and executed."


  • Copyright © 1999-2014 SpaceRef Interactive Inc. All rights reserved. Privacy Policy