SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Friday, November 20, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Studying Unmanned Solution to Complete Space Station as Return to Flight Costs Grow

 
By Frank Sietzen, Jr. and Keith L. Cowing
Sunday, July 24, 2005


image

NASA is completing an internal review that proposes using an expendable launch vehicle derived from space shuttle components to launch and complete the International Space Station following retirement of the shuttle orbiters in 2010, according to senior agency and industry sources.

The study is to be completed in the next two to three weeks. As a result, the public release of Mike Griffin's full 60-day exploration architecture study will be delayed until after the House and Senate return from summer recess in early September, sources explained - a delay of almost two months from Griffin's earlier plans.

Griffin has pledged to legislators a complete proposal to accelerate development of the Crew Exploration Vehicle (CEV), announce the design of its new family of launch vehicles, and the final assembly sequence for the ISS no later than early fall.

The plan is to detail how NASA hopes to alter and, in some cases accelerate the implementation of the Bush administration Vision for Space Exploration (VSE) announced in January 2004. Initial briefings to industry and Congressional representatives several weeks ago fell flat on delivery and left many attendees confused as to what the actual NASA plans are. Griffin was not happy about the initial presentations and has ordered that the whole process be redone. Agency sources note that Griffin's staff feels that they need several weeks to get things into a form that will be ready for public disclosure.

The delay in completing the exploration plan comes as auditors have warned Griffin and his senior staff that the costs of the shuttle fleet's Return to Flight are rapidly rising and may exceed $1 billion in unbudgeted costs by the fiscal year 2007 and possibly $2 billion by 2008. Budget analysts have also told senior NASA staffers that they are unable to predict the final price tag for the shuttle repairs and it could exceed even these new, stark projections.

A tacit acknowledgement of the looming dire budget situation came from Chris Shank, an assistant to Griffin, in a speech to the Space Frontier Foundation's "Return to the Moon Conference" this past weekend. According to sources present at this conference, Shank said that he was specifically cleared by Mike Griffin to say that NASA does not have enough money to implement the exploration architecture it wants to put into place - unless, that is, the private sector lends a hand.

While Griffin's plans for commercial participation in the VSE - and perhaps alleviation of the cost of implementing the VSE - have been sketchy thus far, he has begun to make preparations to seek more funding from Congress.

To alleviate this budget squeeze Griffin may seek a special, one-time Return to Flight supplemental funding from Congress next year to help the agency absorb the impact -- without wrecking plans to advance the VSE. The full implications of the possible cost overruns have not been widely distributed within senior NASA circles, sources say, including the Space Operations Mission Directorate that is responsible for management of the Space Shuttle program. But Griffin's senior staff are not yet convinced a supplemental will be needed or could be passed next year, a year in which the entire U.S. House of Representatives and one third of the U.S. Senate is up for election in November.

According to agency sources Griffin has said that he is determined not to raid other NASA spending accounts to pay for the shuttle's ballooning costs. According to one source, Griffin has ordered the RTF costs to be fully absorbed within the space agency's human spaceflight account. That would leave the ISS science budget and the budget for shuttle operational costs to suffer the full effect of the RTF increases.

Sources say the cost of using a shuttle-derived launch vehicle to complete station assembly post 2010, when the orbiters are retired, could be partially absorbed by the SDV's development costs being attributed to the Constellation project, since the launcher would be used primarily to lift and assemble parts of the return-to-the-moon fleet in low Earth orbit.

Sources familiar with the SDV review say a side-mounted so-called "Shuttle-C" type configuration is once again being strongly looked at as the configuration for the heavy lift booster. Agency planners have favored a stacked or "in line" configuration that mounts a large liquid fueled upper stage and payload module atop a modified space shuttle external fuel tank. While such a design would yield greater payload weight, sources have said that it would also require the most expensive modifications to the existing space shuttle launch infrastructure. A side-mounted configuration, on the other hand, would replace the winged orbiter with the liquid stage and payload module, using many of the same pad interfaces as now employed with the manned vehicle.

Next: A detailed look inside NASA's ongoing shuttle-derived launch vehicle trade studies -and a look at how the CEV's booster choice was made.

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- March Storm 2010 update

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy