SpaceRef

SpaceRef


NASA ISS On-Orbit Status 4 January 2009

Status Report From: NASA HQ
Posted: Sunday, January 4, 2009

image

All ISS systems continue to function nominally, except those noted previously or below. Sunday – off-duty day for CDR Fincke, FE-1 Lonchakov & FE-2 Magnus. Ahead: Week 11 of Increment 18.

Sandy Magnus conducted the T+2d inflight microbiology analyses for the samples collected on 1/2 from the PWD (Potable Water Dispenser) Ambient plus SVO-ZV and SRV-K Warm taps, using the MCD (Microbial Capture Device) and CDB (Coliform Detection Bag) for visual analysis and data recording.

CDR Fincke meanwhile completed the T+5 day visual analysis & data recording of air and surface samples with the surface slides an d Petri dishes of the MAS (Microbial Air Sampling) & SSK (Surface Sample Kit) collected on 12/30.

In the SM (Service Module), FE-1 Lonchakov performed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. Additionally, the FE-1 today checked up on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP-Moscow. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers, replacement of EDV-SV waste water and EDV-U urine containers and performing US condensate processing (transfer from CWC to EDV containers) if condensate is available.]

For troubleshooting the Russian RSK-1 laptop, the FE-1 had ~90 min set aside at 9:00am EST, supported by ground specialist tagup.

The FE-1 also had a number of discretionary tasks on his “time permitting” job list for today –

  • Conducting the frequent status check on the Russian BIO-5 Rasteniya-1 ("Plants-1") experiment, verifying proper operation of the BU Control Unit and MIS-LADA Module fans (testing their air flow by hand). [Rasteniya-1 researches growth and development of plants under spaceflight conditions in the LADA-14 greenhouse from IBMP (Institute of Bio-Medical Problems, Russian: IMBP)],
  • Running a session of the DZZ-2 "Diatomeya" ocean observations program, using an HDV camcorder for nocturnal observations of the ocean to detect and record bio-luminescent glows in high production water areas, and
  • Another ECON KPT-3 session, making observations and taking aerial photography for Russia's Environmental Safety Agency (ECON) using the D2X with SIGMA 300-800mm telephoto lens.

The station residents conducted their regular daily 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-2, FE-1), RED resistive exercise device (CDR, FE-2) and VELO bike with bungee cord load trainer (FE-1).

The crew also have their weekly PFCs (Private Family Conferences), via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Yuri at 6:00am, Sandy at 12:30pm, Mike at 2:30pm EST.

CEO photography can be studied at this “Gateway” website:
http://eol.jsc.nasa.gov (as of 9/1/08, this database contained 770,668 views of the Earth from space, with 324,812 from the ISS alone).

Significant Events Ahead (all dates Eastern Time, some changes possible!):
01/14/09 -- ISS reboost w/SM thrusters
02/09/09 -- Progress M-01M/31P undocking & deorbit
02/10/09 -- Progress 32P launch
02/12/09 -- Progress 32P docking
02/12/09 -- STS-119/Endeavour/15A launch – S6 truss segment
02/14/09 -- STS-119/Endeavour/15A docking
02/24/09 -- STS-119/Endeavour/15A undocking
02/26/09 -- STS-119/Endeavour/15A landing (nominal)
03/25/09 -- Soyuz TMA-14/18S launch
03/27/09 -- Soyuz TMA-14/18S docking (DC1)
04/05/09 -- Soyuz TMA-13/17S undocking
04/07/09 -- Progress 32P undocking & deorbit
05/12/09 -- STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
05/15/09 -- STS-127/Endeavour/2J/A launch - JEM EF, ELM-ES, ICC-VLD
05/27/09 -- Soyuz TMA-15/19S launch
Six-person crew on ISS
08/06/09 -- STS-128/Discovery/17A – MPLM (P), LMC, last crew rotation
08/XX/09 -- Soyuz 5R/MRM2 (Russian Mini Research Module, MIM2) on Soyuz
09/XX/09 -- H-IIB (JAXA HTV-1)
11/12/09 -- STS-129/Atlantis/ULF3 - ELC1, ELC2
12/10/09 -- STS-130/Endeavour/20A – Node-3 + Cupola
02/11/10 -- STS-131/Atlantis/19A – MPLM(P), LMC
04/08/10 -- STS-132/Discovery/ULF4 – ICC-VLD, MRM1
05/31/10 -- STS-133/Endeavour/ULF5 – ELC3, ELC4
12/XX/11-- Proton 3R/MLM w/ERA.

// end //

More status reports and news releases or top stories.

Please follow SpaceRef on Twitter and Like us on Facebook.

NanoRacks