On October 18, 2002, at 11:44 a.m. CDT, Space Shuttle Atlantis successfully landed at the Kennedy Space Center in Florida, concluding the STS-112 mission. This mission was pivotal in the assembly of the International Space Station (ISS), marking the delivery and installation of the Starboard 1 (S1) truss segment, a critical component of the station's structural framework. The mission also featured three spacewalks, enhancing the ISS's capabilities and infrastructure.
Mission Overview
STS-112, designated as the 15th ISS assembly flight (9A), was launched on October 7, 2002, at 3:45 p.m. EDT from Launch Pad 39B at the Kennedy Space Center. The primary objectives included delivering the S1 truss segment and the Crew and Equipment Translation Aid (CETA) Cart A to the ISS. The mission lasted 10 days, 19 hours, 58 minutes, and 44 seconds, during which Atlantis traveled over 4.5 million miles. The crew consisted of Commander Jeffrey S. Ashby, Pilot Pamela A. Melroy, Mission Specialists David A. Wolf, Piers J. Sellers, Sandra H. Magnus, and Russian cosmonaut Fyodor Yurchikhin. The mission concluded with a successful landing at 11:44 a.m. EDT on October 18, 2002, on Runway 33 at the Kennedy Space Center. ([nasa.gov](
Primary Payloads
The mission's main payloads were the S1 truss segment and the CETA Cart A. The S1 truss segment, weighing approximately 28,000 pounds, is a vital component of the ISS's structural framework, providing support for the station's radiators and other essential systems. The CETA Cart A is the first of two human-powered carts designed to traverse the ISS's Mobile Transporter, offering mobile work platforms for astronauts during spacewalks. These additions significantly enhance the ISS's operational capabilities and support future assembly and maintenance activities. ([nasa.gov](
Spacewalks and Assembly Activities
During the mission, the crew conducted three spacewalks to install the S1 truss segment and perform related tasks. The first spacewalk, lasting 7 hours and 1 minute, involved connecting power, data, and fluid lines, releasing locks on a beam to allow the S1 radiators to be oriented for optimal cooling, deploying an antenna, and releasing restraints on the CETA cart. The second spacewalk, lasting 6 hours and 4 minutes, focused on preparing the CETA cart for future use, installing 22 Spool Positioning Devices on the ISS ammonia cooling line connections, installing an exterior television camera outside the Destiny module, connecting ammonia supply lines to the S1 radiator, and checking equipment for the installation of the next starboard truss. The third spacewalk, lasting 6 hours and 36 minutes, involved removing a bolt that prevented activation of a cable cutter on the mobile transporter, connecting ammonia lines, removing structural support clamps that held the S1 Truss in place during launch, and installing Spool Positioning Devices on a pump motor assembly that helps circulate ammonia through the ISS cooling system. These activities were crucial for integrating the S1 truss segment into the ISS and ensuring its functionality. ([spaceline.org](
Landing and Post-Mission Activities
After completing the mission objectives, Atlantis performed a deorbit burn at 10:44 a.m. CDT, initiating its descent toward the Kennedy Space Center. The shuttle touched down on Runway 33 at 11:44 a.m. CDT, marking the 60th landing of a Space Shuttle at the center. The crew was met by the new state-of-the-art Convoy Command Vehicle, which replaced a 15-year-old model and is used to control critical communications between the orbiter, the crew, and the Launch Control Center, monitor the health of the Shuttle Orbiter systems, and direct convoy operations at the Shuttle Landing Facility. Following the landing, the crew underwent physical examinations and participated in a post-mission press conference at the Kennedy Space Center News Center. ([](
International Space Station Status
During the mission, the ISS continued to function nominally. The Expedition Five crew aboard the station, consisting of Commander Valery Korzun, NASA ISS Science Officer Peggy Whitson, and Cosmonaut Sergei Treschev, were in their 135th day in space and 133rd aboard the station. They were able to watch Atlantis's safe landing and continued to unpack and stow supplies delivered by the shuttle crew. Their next visitors were the three members of a Soyuz Taxi Crew scheduled to deliver a fresh rescue spacecraft to the station later that month. ([](
Conclusion
The successful completion of the STS-112 mission was a significant milestone in the assembly and enhancement of the International Space Station. The delivery and installation of the S1 truss segment and the CETA Cart A have been instrumental in expanding the ISS's structural framework and operational capabilities. The mission's three spacewalks were essential for integrating these components and ensuring the station's continued functionality. The safe return of Atlantis and its crew marked the end of a successful mission that contributed substantially to the advancement of human space exploration. ([nasa.gov](